Holy Cross Priory Chapel

Holy Cross Priory Chapel

The chapel at Holy Cross Priory was built in 2013, however residents started to report water ingress issues within the chapel. It was found that the existing single ply system was failing and required a replacement. The roof was stripped and a new cut to fall insulation scheme was installed to improve thermal efficiency and improve drainage. A new single ply system was installed.

roofing-awards-2020

PROJECT DETAILS

Heathfield, UK
70m2 flat roof area

SYSTEM DETAILS

Protan EX-A 1.5 Single Ply membrane, fully adhered
20-year Protan Roofing System