HOVE PARK SCHOOL – Hangleton Way Campus

This roof was part of a staged contract to replace all flat roof areas on this site. This project required extensive scaffolding to access the large roof area which needed to be erected during the school’s summer holiday. As some of the works would be taking place in term time, Health & Safety was paramount to protect the wellbeing of the staff and children during school hours.

As a trusted Garland installer for Brighton & Hove City Council, Invictus Roofing was contracted with stripping the failing roof covering and supplying and fitting a new Garland felt system in accordance with the strict specifications laid out by the manufacturer, as well as increase the insulation efficiency throughout.  New cladding and rainwater goods were also installed so that the water drainage needs of this roof are met to prevent future issues.

Before

HOVE PARK SCHOOL – Hangleton Way Campus
HOVE PARK SCHOOL – Hangleton Way Campus
HOVE PARK SCHOOL – Hangleton Way Campus

After

HOVE-PARK-SCHOOL-Hangleton-Way-Campus-after-3
HOVE PARK SCHOOL – Hangleton Way Campus
HOVE PARK SCHOOL – Hangleton Way Campus

Project Details

Client: Brighton & Hove City Council
Location: Hove, UK
 1000m2 Flat Roof Area
 Works completed within 8 weeks

System Details

StressPly Self-Adhesive Metal Lined VCL
Tapered Insulation Scheme
 Garland TorchFlex Ultravent Underlay to area
 Garland TorchFlex Base Sheet to details
 Garland StressPly cap sheet in Red