Hove Park School & Sixth Form College – Valley Campus

This roof was part of a staged contract to replace all flat roof areas on this site. This project was due to started during term time, therefore the works had to be conducted under diligent Health & Safety precautions to protect the staff and children during school hours.

As a trusted Garland installer for Brighton & Hove City Council, Invictus Roofing was contracted with stripping the failing roof covering and supplying and fitting a new Garland felt system in accordance with the strict specifications laid out by the manufacturer, as well as increase the insulation efficiency throughout.  New cladding and rainwater goods were also installed so that the water drainage needs of this roof are met to prevent future issues.

Before

Hove-Park-Lower-School-before-2
Hove-Park-Lower-School-before-1
Hove-Park-Lower-School-before-3

After

Hove-Park-Lower-School-after-3
Hove-Park-Lower-School-after-1
Hove-Park-Lower-School-after-2

Project Details

Client: Brighton & Hove City Council
Location: Hove, UK
 300m2 flat roof area
 Works completed within 4 weeks

System Details

30-year Garland build up felt
Stressply Self-Adhesive Metal Lined VCL
Tapered Insulation Scheme
 Garland TorchFlex Ultravent Underlay to area
 Garland TorchFlex Base Sheet to details
 Garland TorchFlex Base Sheet to details
 Garland StressPly cap sheet in Red

Review

“We had a very large roof replacement completed on split sites at Hove Park School in 2017. We had our Gymnasium roof replaced at our Valley Campus during term time and Invictus Roofing catered for all our requests when it came to compound and delivery times. All works carried out over term time was taken with care over the day to day running of the School. Invictus Roofing fulfilled all requests, solved any issues, and always put our student’s needs and safety first. I would happily use Invictus Roofing again in the future.”

Danny Compton, Site Manager, Hove Park School and Sixth Form College